EV Charging Expert

EV Charging Expert Witness

A licensed forensic electrical engineer who has led EV charging engineering, for counsel and carriers handling charger failures, installation defects, and EV infrastructure disputes.

  • Licensed PE, 20+ years in power systems
  • Same-day conflict check. Send party names, get clear or conflicted the same business day.
  • Plaintiff and defense. No contingent fees.

Run a Conflict Check

Party names are what the check runs against. Nothing privileged is requested.

Submitting does not create an engagement. First substantive reply the same business day.

EV Charging Matters Analyzed by an EV Charging Engineer

Ohm Forensics provides EV charging expert witness services in litigation, arbitration, and insurance claims. EV charging failures usually come down to a small set of questions: was the equipment defective, was it designed and installed to code, was the electrical service adequate for the load, and did protection and grounding perform as required.

The engineer on these matters has designed standard and fast EV charging projects and led engineering for an EV charging provider, so the analysis reflects how chargers are specified, permitted, installed, and maintained in practice.

Typical Matters

EV charging station failures

Standard and fast charging stations, cables, connectors, and supporting electrical equipment, with defect, installation, and misuse theories tested against the evidence.

Installation and design defects

Electrical capacity, wire and breaker sizing, connections, and compliance with the electrical code and local requirements.

Electrical shock and injury

Shock incidents at chargers, including grounding, bonding, and ground fault protection.

Service capacity and utility disputes

Electrical service upgrades, site preparation work, and coordination with the utility.

Standard of care

Whether the engineer, contractor, or installer met the standard of care for EV charging design and installation.

Commercial and warranty disputes

Disputes between property owners, installers, equipment suppliers, and charging providers over equipment and installation quality.

What the Analysis Draws On

Design and permit records

Drawings, load calculations, permit sets, and inspection records.

Charger data

Charger and network session logs, fault codes, and maintenance tickets.

Site inspection

Examination of the charging station, wiring, connections, breakers, and grounding.

Laboratory work

Testing of failed components through an outside independent laboratory under an agreed protocol.

Experience Behind the Opinions

The work is led by a licensed Professional Engineer with an MBA and more than twenty years in power systems. That career was spent designing and reviewing the kinds of systems that end up in dispute: utility substations from 4 kV to 345 kV, utility-scale solar and battery storage plants, EV charging installations, and medium voltage distribution for large data centers, along with protection and coordination, fault current, and arc flash studies.

The engineering practice is still active. Opinions rest on current codes, current equipment, and current utility practice, which matters when opposing counsel asks when the expert last designed the thing being testified about.

Questions Counsel Asks

Do you cover both standard and fast charging stations?

Yes. The engineer has designed and reviewed standard and fast charging installations for commercial, multifamily, and fleet sites.

Can you tell whether a failure was the charger or the installation?

Often, yes. Comparing the damage pattern with the charger's fault logs, the installation details, and the electrical service usually points to the equipment, the installation, or the use. Where the evidence does not separate them, the report says so.

What should be preserved after a charger failure?

The charging station and its cable, the breaker and wiring that feed it, and the charger's session and fault logs from the network provider, which may be retained only for a limited time.

No contingent fees. Compensation is never tied to the outcome of the matter or to any finding. The rate schedule and the CV of the designated engineer are sent the same business day you ask.

Send the Party Names. Conflicts Checked the Same Day.

No engagement, no cost. If we are conflicted or this is not the right discipline for your question, we will say so.

Request Conflict Check (213) 267-1812 anne@ohmforensics.com
Call Now Conflict Check